Project Portfolio & Engineering Case Studies
Washroom Partition Projects in Qatar
Explore technical scopes, material configurations, and installation methodologies delivered across Qatar commercial towers, educational campuses, sports complexes, healthcare clinics, and industrial facilities.
[VERIFICATION REQUIRED — CLIENT PORTFOLIO STAGED]
In strict compliance with our corporate transparency policy, project names and client contracts are subject to verified client authorization under NDA. The technical scopes below demonstrate verified specification configurations engineered for Qatar commercial washrooms.
Verified B2B Technical FrameworksProject Database
Filter Projects by Sector & Material Specification
Select criteria below to view relevant technical installation scopes across Qatar.
Commercial SpecificationWest Bay, Doha
Material Specification:13mm Solid Compact Laminate with Grade 304 Stainless Steel Hardware
Package Scope:Full-height executive toilet cubicles, matching wall-hung urinal privacy screens, and integrated plumbing system (IPS) duct access panels.
Engineering Challenge:Tight floor tolerances in high-rise core with strict off-peak freight elevator access hours.
Delivered Solution:Pre-cut CNC panels with modular numbering delivered during scheduled night slots, installed with laser-leveled structural headrails.
Educational InfrastructureAl Rayyan / Education City
Educational Academy Facility — Al Rayyan
Material Specification:12mm Solid Phenolic Compact Board with Anti-Finger-Trap Hinges
Package Scope:Student toilet cubicles across primary and secondary wings, staff restrooms, and corridor student locker banks with padlock hasps.
Engineering Challenge:Strict summer holiday handover deadline before academic semester opening; zero tolerance for sharp edges or pinch hazards.
Delivered Solution:Dual installation teams operating parallel shifts, installing factory-radiused panels and continuous aluminum safety hinge guards.
Clinical HygieneDoha, Qatar
Medical & Healthcare Clinic — Doha
Material Specification:Solid Compact Laminate (EN 438-4) with Suspended Ceiling-Hung Mounts
Package Scope:Patient washroom cubicles, universal accessible barrier-free stalls, and clinical staff changing cabins.
Engineering Challenge:Meeting rigorous infection-control protocols requiring unobstructed daily floor scrubbing.
Delivered Solution:Structural overhead beam cantilever mounting, providing full floor clearance and seamless sanitary joint detailing.
Wet-Area EngineeringLusail City, Qatar
Sports & Fitness Wet Area Project — Lusail
Material Specification:Water-resistant solid phenolic Shower Cabins & Z-Locker Banks
Package Scope:Two-compartment wet/dry shower stalls, changing cubicles with integrated benches, and RFID wristband-compatible lockers.
Engineering Challenge:Continuous ambient steam and moisture from hot showers and adjoining hydrotherapy areas.
Delivered Solution:Solid moisture-impermeable compact laminate boards combined with marine-grade Grade 316 stainless steel fittings.
Industrial Heavy DutyIndustrial Area, Doha
Industrial Facility Worker Welfare — Industrial Area, Doha
Material Specification:AISI Grade 304 Stainless Steel Honeycomb & Heavy Compact Laminate
Package Scope:Workshop communal toilet cubicles, high-pressure washdown shower stalls, and dual-compartment clean/dirty uniform staff lockers.
Engineering Challenge:Heavy grease exposure, boot impacts, and requirement for daily high-pressure hose-down sanitization.
Delivered Solution:Heavy-gauge stainless steel floor boots anchored into subfloor concrete with epoxy expansion anchors and sloped locker dust tops.
Luxury HospitalityDoha Corniche / Waterfront
Hospitality Public Restroom Project — Doha Waterfront
Material Specification:Toughened Ceramic Back-Painted Glass with PVD Bronze Hardware
Package Scope:Floor-to-ceiling zero sightline glass cubicles with concealed soft-closing hydraulic floor pivots for grand ballroom restrooms.
Engineering Challenge:High acoustic isolation and zero visible floor fixings required to preserve high-value imported marble flooring.
Delivered Solution:Concealed overhead structural track suspension with hydraulic pivot damping and magnetic light-tight perimeter gaskets.
Main Contractor Support
Require Technical Submittals for Your Upcoming Tender?
We provide complete contractor support packages including unpriced quantity take-offs, compliance matrices, physical color swatches, and CAD shop drawings.